Initial depictions of the family bathroom situated on Wartberg
The picturesque town of Wartberg is set to receive an exciting upgrade to its Panoramabad facilities. Initial plans, presented by Mayor Peter Boch, Deputy Mayor Dirk Büscher, and Baths Director Lutz Schwaigert in 2024, have been in motion, with the project designed by the renowned Stuttgart architectural firm asp architects.
At the heart of the development is an impressive indoor pool area on the ground floor. This expansive space will include a 25-meter long swimming pool, a leisure pool, a teaching/swimming pool, and a diving board with 1- and 3-meter platforms. For the little ones, there will be a small children's wading pool and a "spray park" for even more fun. The indoor pool area will also feature a slide with a landing pool, adding an extra element of excitement.
Moving up to the first floor, visitors will find a 550 square meter sauna landscape. This tranquil space will offer a warm air bath, steam bath, infusion sauna, cooling pool, and relaxation areas, ensuring a relaxing experience for all. The rooftop will boast a 40 square meter "Panoramasauna," offering breathtaking views of the valley and the Black Forest.
The roof of the building will also house an "infinity pool" that promises a stunning view over the surrounding landscape. The accessible green roof will be equipped with sauna outdoor facilities and the infinity pool at the peak of the roof structure.
The estimated cost for the new indoor pool is around 53 million euros, with the renovation of the outdoor pool estimated at 12 million euros. The first tenders for the project could take place at the beginning of 2025, and the earliest completion of the combined baths, including the new indoor pool and the renovated outdoor pool, is by 2027.
The design for Panoramabad Wartberg guarantees an implementation that meets all the needs and demands of the city, with the building being a terraced structure with panoramic windows on the southern side of the Wartberg bath grounds. The outdoor pool area will be supplemented by a new non-swimmer pool and a new children's wading pool.
As the project progresses, the community of Wartberg looks forward to enjoying the enhanced facilities at Panoramabad Wartberg, including the integrated indoor catering facility. Stay tuned for updates on this exciting development.
[1] While the search results do not contain any specific information about the current status, construction timeline, cost, or updates of the Panoramabad Wartberg project since its initial plans unveiled in 2024, further research may provide more details as the project progresses.
The Panoramabad Wartberg project promises an exciting transformation, extending beyond the indoor facilities to include an outdoor pool area with a new non-swimmer pool and a children's wading pool, contributing to an overall lifestyle of outdoor-living and home-and-garden blending harmoniously. In the heart of this development, residents and visitors will have the opportunity to enjoy a revitalized home-and-garden experience, incorporating the relaxing ambiance of home with the invigorating allure of outdoor-living.